MGMT-21454: Align with ART for OCP 4.20 #1094
Open
Red Hat Konflux / Red Hat Konflux / assisted-installer-agent-ds-main-on-pull-request
succeeded
Aug 26, 2025 in 13m 43s
Success
Red Hat Konflux/assisted-installer-agent-ds-main-on-pull-request has successfully validated your commit.
Details
- Namespace: assisted-installer-tenant
- PipelineRun: assisted-installer-agent-ds-main-on-pull-request-k25qn
Task Statuses:
Status | Duration | Name |
---|---|---|
🟢 Succeeded | 4 seconds | |
🟢 Succeeded | 14 seconds | |
🟢 Succeeded | 1 minute | |
🟢 Succeeded | 4 minutes | |
🟢 Succeeded | 4 minutes | |
🟢 Succeeded | 2 minutes | |
🟢 Succeeded | 8 minutes | |
🟢 Succeeded | 16 seconds | |
🟢 Succeeded | 15 seconds | |
🟢 Succeeded | 43 seconds | |
🟢 Succeeded | 10 seconds | |
🟢 Succeeded | 2 minutes | |
🟢 Succeeded | 1 minute | |
🟢 Succeeded | 9 seconds | |
🟢 Succeeded | 6 seconds | |
🟢 Succeeded | 46 seconds | |
🟢 Succeeded | 1 minute | |
🟢 Succeeded | 14 seconds | |
🟢 Succeeded | 1 minute | |
🟢 Succeeded | 9 seconds | |
🟢 Succeeded | 6 seconds |
Loading